Ratio limits · Bias correction · January initialization · FMAM and its months

Ratio limits · January initialization · FMAM and its months

The operational correction limits the spread ratio r = σobs/σmodel to 0.5–2. This study runs the same screening and confirmation for that correction with wider limits (1/3–3, 1/4–4) and none, all with the same fallback (r = 1 where the model spread is below 1 mm), to see whether the limits are worth changing. ✓ = better than the operational limits with Holm-adjusted p < 0.05 across the 3 alternatives × 5 targets and not worse over the test years. Run at commit fb7425f.

Confirmed better than the operational limits — published (blended) probabilities: none; rainfall amounts: MVS, ratio limits 1/3-3 (Feb), MVS, ratio limits 1/4-4 (Feb, Mar) and Variance Scaling (unbounded) (Feb, Mar).

Probabilities

Blended tercile RPSS through the full pipeline, outer leave-one-year-out 1993–2016
MethodFebMarAprMayFMAM
Mean-Variance Scaling (operational, 0.5–2)+0.027+0.002+0.001+0.028+0.032
MVS, ratio limits 1/3-3+0.029+0.002+0.001+0.028+0.033
MVS, ratio limits 1/4-4+0.029+0.003+0.002+0.028+0.033
Variance Scaling (unbounded)+0.029+0.003+0.002+0.028+0.033

Amounts

Amount CRPSS, leave-one-year-out 1993–2016
MethodFebMarAprMayFMAM
Mean-Variance Scaling (operational, 0.5–2)+0.070-0.044-0.016+0.007+0.025
MVS, ratio limits 1/3-3+0.076 ✓-0.041-0.016+0.007+0.025
MVS, ratio limits 1/4-4+0.076 ✓-0.040 ✓-0.016+0.007+0.025
Variance Scaling (unbounded)+0.076 ✓-0.040 ✓-0.016+0.007+0.025

Where the operational limits act

Share of the corrected area, mean over the leave-one-year-out folds, 1993–2016
TargetLower limit active (r would be < 0.5)Upper limit active (r would be > 2)Spread–error, operationalSpread–error, no limits
Feb20%9%1.021.05
Mar2%9%0.930.95
Apr0%6%0.950.96
May0%6%0.960.97
FMAM0%7%0.980.99

← ConfirmationShadow and validation →