Ratio limits · September initialization · ONDJ and its months
The operational correction limits the spread ratio r = σobs/σmodel to 0.5–2. This study runs the same
screening and confirmation for that correction with wider limits (1/3–3, 1/4–4) and none, all with the same fallback (r = 1 where
the model spread is below 1 mm), to see whether the limits are worth changing. ✓ = better than the operational limits with
Holm-adjusted p < 0.05 across the 3 alternatives × 5 targets and not worse over the test years. Run at
commit fb7425f.
Confirmed better than the operational limits — published (blended) probabilities: none; rainfall amounts: MVS, ratio limits 1/3-3 (Jan), MVS, ratio limits 1/4-4 (Jan) and Variance Scaling (unbounded) (Jan).
Probabilities
Blended tercile RPSS through the full pipeline, outer leave-one-year-out 1993–2016
| Method | Oct | Nov | Dec | Jan | ONDJ |
| Mean-Variance Scaling (operational, 0.5–2) | +0.013 | +0.040 | +0.003 | +0.001 | +0.039 |
| MVS, ratio limits 1/3-3 | +0.013 | +0.041 | +0.004 | +0.001 | +0.039 |
| MVS, ratio limits 1/4-4 | +0.013 | +0.041 | +0.004 | +0.001 | +0.039 |
| Variance Scaling (unbounded) | +0.013 | +0.041 | +0.004 | +0.001 | +0.039 |
Amounts
Amount CRPSS, leave-one-year-out 1993–2016
| Method | Oct | Nov | Dec | Jan | ONDJ |
| Mean-Variance Scaling (operational, 0.5–2) | -0.002 | +0.084 | +0.028 | -0.048 | +0.070 |
| MVS, ratio limits 1/3-3 | -0.004 | +0.082 | +0.031 | -0.013 ✓ | +0.063 |
| MVS, ratio limits 1/4-4 | -0.004 | +0.082 | +0.031 | -0.008 ✓ | +0.063 |
| Variance Scaling (unbounded) | -0.004 | +0.082 | +0.031 | -0.007 ✓ | +0.063 |
Where the operational limits act
Share of the corrected area, mean over the leave-one-year-out folds, 1993–2016
| Target | Lower limit active (r would be < 0.5) | Upper limit active (r would be > 2) | Spread–error, operational | Spread–error, no limits |
| Oct | 1% | 12% | 0.90 | 0.93 |
| Nov | 5% | 9% | 1.01 | 1.02 |
| Dec | 17% | 6% | 0.96 | 1.00 |
| Jan | 26% | 28% | 0.83 | 1.00 |
| ONDJ | 2% | 22% | 0.96 | 1.01 |